SECTION .0900 ‑ INSPECTION AND TESTING

 

01 ncac 05b .0901          RESPONSIBILITY

In general, it is the responsibility of the receiving agency to inspect all materials, supplies, and equipment upon delivery to insure compliance with the contract requirements and specifications.  However, when the contract requires an inspection by the Division of Purchase and Contract, it shall be conducted by a designee of the Division.

 

History Note:        Authority G.S. 143‑60;

Eff. February 1, 1976;

Readopted Eff. February 27, 1979;

Amended Eff. February 1, 1996;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. July 23, 2016.